Rigging Consultation & InstallationTerms & Conditions
Effective Date: November 1, 2026
1. Agreement and Scope
These terms apply to rigging consultations, equipment sales, installations, modifications, inspections, and related services provided by the legal business entity identified on the applicable estimate or invoice ("Company").
By accepting an estimate or authorizing work, the customer agrees to these terms.
Services are limited to the work specifically described in the accepted estimate, proposal, or written agreement. Any additional equipment, labor, engineering, testing, or services must be separately agreed upon.
If a signed project agreement conflicts with these terms, the signed agreement controls.
2. Consultation and Recommendations
Rigging consultations and recommendations are based on the information available at the time of evaluation, including site conditions, customer-provided documentation, intended equipment use, and anticipated loading.
Unless expressly included in the written scope, consultations do not constitute a structural engineering certification, stamped design, or independent verification of a building's load-bearing capacity.
Where professional engineering is required, it must be performed or approved by an appropriately licensed professional.
Recommendations may require revision if actual site conditions, equipment specifications, or intended uses differ from those originally provided.
3. Structural Capacity and Engineering
Unless expressly included in the agreed scope, the customer is responsible for obtaining appropriate verification that the supporting building, structure, attachment points, and load paths can safely accommodate the proposed rigging and anticipated static and dynamic loads.
The Company is responsible for performing its contracted work with reasonable care but does not warrant the structural adequacy of existing buildings, supporting structures, or customer-provided attachment systems that are outside the agreed scope.
No stated equipment rating should be interpreted as certification of the supporting structure.
4. Permits and Approvals
Unless otherwise agreed in writing, customers are responsible for obtaining required permits, building-owner approvals, engineering documentation, and inspections by applicable authorities.
The Company may recommend that certain approvals or evaluations be obtained before work proceeds or equipment is placed into service.
5. Site Access and Conditions
Customers must provide reasonable access to the work area and disclose known hazards, access restrictions, structural concerns, and relevant site conditions.
Unanticipated conditions, including inaccessible attachment points, unsuitable structures, additional equipment needs, or other complications, may require changes to the project scope, price, or schedule.
Additional charges will be communicated for approval before the associated extra work proceeds, except where immediate action is necessary to address a safety hazard.
6. Project Changes and Additional Work
Any requested changes to equipment, rigging configuration, installation methods, or project scope may affect pricing and scheduling.
Material changes must be approved by both parties in writing, including by email or other documented electronic communication, before additional work proceeds.
7. Pricing and Payment
Payment schedules are established in the accepted estimate or invoice.
For installation projects exceeding $1,000, the standard arrangement is 50% due upon acceptance of the project and the remaining 50% due upon installation, unless otherwise agreed in writing.
Consultations, inspections, and smaller projects may have different payment requirements.
Completed services and specially ordered materials remain payable according to the applicable agreement. Any cancellation or refund is subject to the project-specific terms and applicable law.
Past-due payments and remedies for nonpayment are governed by the applicable agreement and law.
8. Installation and Handoff
The Company will perform the installation work specified in the agreed scope.
Upon completion, the customer is responsible for ensuring that equipment is used only within its documented operating limitations and that personnel are appropriately trained.
Unless expressly included, installation does not include ongoing supervision, operator certification, recurring inspections, or future maintenance.
Any required engineering approvals, inspections, or commissioning procedures must be completed before equipment is placed into service.
9. Equipment Use, Maintenance, and Modifications
Rigging equipment requires appropriate use, regular inspection, and maintenance.
Following installation, the customer is responsible for:
- Following manufacturer instructions and documented load limits.
- Establishing appropriate inspection and maintenance procedures.
- Ensuring users are adequately trained and supervised.
- Removing damaged, worn, or questionable equipment from service.
- Preventing unauthorized alterations to installed systems.
- Obtaining qualified review before changing equipment configurations, loads, or attachment arrangements.
Changes in equipment use, loading, or supporting structures may invalidate previous recommendations or evaluations.
10. Equipment and Workmanship
Equipment supplied by the Company may be subject to manufacturer warranties and limitations.
Any separate workmanship warranty must be expressly stated in the accepted project documentation.
Customers should report suspected installation defects promptly and discontinue use of affected equipment when safety is in question.
The Company will review reported concerns related to its contracted work and address its obligations under the applicable agreement and law.
11. Risk and Liability
Circus, aerial, theatrical, and recreational rigging systems may involve elevated loads, dynamic forces, and risks of serious injury or property damage.
Proper installation is one component of a safe operating environment. Continued safe operation also depends on appropriate equipment selection, supporting structures, inspection, maintenance, training, and use.
The Company does not guarantee that any rigging activity or installation is free from all risk.
To the extent permitted by law, neither party is liable to the other for indirect or consequential economic damages arising from the agreement, including lost profits or business interruption.
Nothing in these terms excludes or limits responsibility for negligence, personal injury, defective work, or other liabilities where such exclusion or limitation is prohibited by law.
12. Scheduling and Delays
Project schedules are estimates unless expressly guaranteed in writing.
Delays caused by site readiness, permitting, engineering approvals, customer-requested changes, unavailable materials, unsafe conditions, or circumstances outside the Company's reasonable control may require rescheduling.
The parties will communicate material scheduling changes as reasonably practicable.
13. Governing Law
These terms are governed by Texas law unless a separate signed agreement specifies otherwise.
Disputes will be handled in a court of competent jurisdiction, subject to applicable law.
14. Changes to These Terms
The Company may update its published terms periodically. Unless separately agreed, the version in effect when the customer accepts the applicable estimate or authorizes work governs that project.
15. Contact
For questions about rigging consultations, equipment, installation services, or these terms, please contact the business identified on your estimate or invoice.
Website: https://dallascircus.com